Coupe Green, Preston

  • Overcome design changes from using traditional construction methods to timber at the start of the project
  • Acting Principal Contractor for first 5 months of the project
  • Site set up, health and safety requirements passed and built a good rapport with local residents.
  • Completed all roads, sewers and client compound in the first 5months
  • Client is a FTSE 250 Company working across UK
  • Programme length – 24months
  • Estimated contract value – £3,600,000

Waters Cross

Watling Street – Northwich

  • Full groundworks package
  • Development of 70 units
  • Site strip and clearance
  • Foundations
  • Plot Drainage
  • Attenuation system to suite 100 year flood
  • Adoptive connections
  • Completed ahead of schedule

HV Powerlines

  • Trace and locate HV power lines.
  • Trace locate and hand excavate to expose cables
  • Specialist jointing team to complete repair works
  • Backfill, level and pack as per specification and reinstate all areas.
  • Wind turbines had to be turned off as unsure which cable coming in was a problem
  • Short notice – 3 days from enquiry to starting work.

Mount View

Mount View, Malpas – Orchard House Properties

  • Development of 8 luxury detached houses.
  • Roads and sewers.
  • Attenuation.
  • 278 works for Cheshire West and Chester Council.
  • Adoptable connection for Welsh Water.
  • Traditional foundations.
  • Substructure.
  • Diversion of trunk water main.
  • Installation of utilities.